In spite of some cold weather, work has been moving along well with the Guth Electric building in Dundas. The exterior wall panels are in place and look good with the esterior masonry wainscote….

The interior is bright with the insulation in place…..

It won’t be long before the steel roofing panels are installed and locked into place and interior work can start…..

NCCadmin

Author Since: 25 / Apr / 2018

About Author