100_3743 Our carpenters have been busy on our Prior Lake dental100_3744 clinic project. The main task at hand was framing the addition. They are working on the roof system today. The roof on the new addition is set several feet higher than the existing roof. This creates quite a dramatic appearance for the new addition. Once we are done with this roof we create two new smaller roofs at the existing portion of the building.

100_3746 We are not in charge of the stone veneer that is being installed on the building, but the masons have been busy with that work as well. The veneer sits on a cast concrete masonry unit at the base creating a nice transition between the ground and the building.