Wells Fargo Entrance

On Monday we installed new concrete walks at the Wells Fargo bank project. The walks were needed to provide access to the new front entrance installed earlier. Minnesota’s climate can be tough on concrete. The existing concrete was cracked in many places and joints had shifted. We used expansion joints and control joints in an ...

Interior at Faith Lutheran

  The interior of the Faith Lutheran church addition and remodel in Dodge Center is moving along very nicely. The carpenters have been focusing their attention on interior trims, and door, millwork and cabinet installation. Some of the offices have great new bookcases.

The sanctuary is really shaping up. It has a very...

Finishing at Wells Fargo Bank

Our work on phase one at Wells Fargo is drawing to a close. The project has been phased so that banking work can continue during the construction process. The first phase involved leaving the existing entrance and teller lines in place and constructing a new entrance and teller line. Once this work is complete the bank staff will...

Wells Fargo Phase 2

This week we started on Phase 2 of the Wells Fargo Bank remodeling project. Phase 1 was completed last week with the installation of carpet, the final touches on the teller lines, and installation of the electronic equipment. The new front door is now in use for bank customers.

 

 

The old tell...

St. John’s Lutheran Church

This week we started some renovation work at in Northfield. The church had some exterior brick tuckpointing done last year. We assisted the firm doing that work and the church with some miscellaneous carpentry repairs at that time. Our work this year mainly includes roof and flashing repairs.

 

The first ta...

St. John’s roofing

We’ve started applying roofing products at St. John’s Lutheran church in Northfield. Our first task was to erect safe scaffold to work from. Now that we have the scaffold up and flashing preparations made the workers are applying the roof tiles.

The church elected to use a synthetic roof tile that has the appearance ...

Wells Fargo, Phase II

Phase two of our Wells Fargo bank remodeling project is starting to wind down. Phase one work included a new teller line which has been installed. It looks great and is working nicely for bank customers. It includes solid surface work counters which should serve the bank well for many, many years.

The phase two work has...

Three Links Apartments

Last week we started a big project at Three Links Apartments here in Northfield. The work involves replacing all the windows in the building, remodeling roughly 68
kitchens, renovating and upgrading the elevator, and miscellaneous
bathroom and floor covering upgrades. We also will be excavating portions
o...

St. John’s roofing

Our workers have progressed nicely on the St. John’s Lutheran church roofing project that we are doing. We are applying a synthetic shingle that looks like slate roofing. The job has gone well and the workers like the shingle product.

The specifications call for copper flashings in many areas. Copper is an excellent c...

Three Links windows

Our workers have been making good progress on our Three Links remodeling project. The clear, dry weather has allowed them to move along well with the window replacements. They have a good process in place for removing the existing windows and keeping the dust and debris to a minimum. It really helps to have equipment with vacuum ...